Friday, December 03, 2010

Another night in the shed


The dope has arrived today, so we need to get stuck in. Probably have a go at the empenage in the next few weeks then clean up the wings.
Posted by Picasa

Monday, October 11, 2010

Start on the bottom

Have now turned the fuselage over and continuing to scrape!

Monday, August 09, 2010

Pano shot of H17

A Panorama shot inside the shed. The port wing in the background has also lost some of its fabric. The new colour scheme will be clear fabric and white dope. The clear dope has a delivery time of 4 months ex USA.

Work Continues



Horse collar is in need of work. The windscreen is crazed and will be replaced, the instrument panel will be upgraded. I think I will put skylights in the sides to illuminate the panel more too. Don't know if I will replace the red release knob though (old glue bottle cap). It has a certain charm!

Saturday, May 22, 2010

Start Stripping the H17


Getting the Elevator moments.


Now the fabric can start coming off.
Posted by Picasa

Thursday, May 06, 2010

Hutter Control Deflections 2

Set up for the elevator (not zeroed).














Elevator datum used.




With any luck we should see this flying by summer in a new paint scheme and a fresh 20 yearly.
Posted by Picasa

Hutter Control Deflections 1

Setting up the angle measurement device on the wing to determine control deflections.











Aileron droop under normal conditions (about 1.5 deg.)


Posted by Picasa

Saturday, May 01, 2010

A Bit More Hutter


Found an old T&B that someone had drilled out the mounting holes too big. Will probably put it in the Hutter. I wrote to Winter to see what a new faceplate would cost and they sent me one for free!! "Sehr nett" of Herr Winter.

Now ready to start stripping the poor old thing back.
Posted by Picasa

Monday, April 12, 2010

Hutter - First Good Look 2


More snaps from the first general inspection night. Even more pictures here...

Posted by Picasa

Hutter - First Good Look 1


Start the inspection work associated with the Form 2 and 20 yearly. I still haven't paid for the paperwork, but there's several months of work ahead, so not in a rush too much to pay at this stage.
I've got an inspection plan laid out and will probably put together a covering/paint scheme in the near future. Do the control deflections then onto the major structural inspection to find out what is under the skin...


Posted by Picasa